OEE measures how much of planned production time a machine spends making good parts at full speed. It multiplies three ratios: availability, performance and quality. A score of 1.0 means only good parts, as fast as possible, with no stops.
| Kind | metric |
|---|
OEE = A * P * Q
| Symbol | Name | Min | Max |
|---|---|---|---|
| A | Availability | 0 | 1 |
| P | Performance | 0 | 1 |
| Q | Quality | 0 | 1 |
A = 0.9, P = 0.95, Q = 0.98 → 0.8379