Takt Time

Takt time is the available production time divided by customer demand. It gives the rate at which a product must be completed to match demand, and is used as the pacing reference for a lean production system. For example, 480 available minutes per day divided by 240 units of daily demand gives a takt time of two minutes.

Source checked5/5 values · 2026-10-25Metric

Specification

1 source
Kindmetric
OriginGerman aircraft industry, 1930s; Toyota, 1950s

Formula

Takt time = T / D
SymbolName
TAvailable production time
DCustomer demand
Worked example: T = 480, D = 240 → 2

Study notes

  • Takt is German for a precise interval of time, such as a musical meter.
  • First used as a production management tool in the German aircraft industry in the 1930s, as the interval at which aircraft were moved to the next production station.
  • Widely utilized within Toyota in the 1950s and in widespread use throughout the Toyota supply base by the late 1960s.
  • Toyota typically reviews the takt for a process every month, with a tweaking review every 10 days.
  • The stated purpose is to precisely match production with demand.
  • A second worked case in the source: demand of two new products per month gives a takt time of two weeks.
↑↓ navigate↵ openesc close