Changeover

Changeover is the process of switching production from one product or part number to another on a machine or on a series of linked machines by changing parts, dies, molds, fixtures and similar items. It is also called a setup. Changeover time is measured as the time elapsed between the last piece of the run just completed and the first good piece produced after the changeover.

Source checked1/1 values · 2026-10-25Methodology

Specification

1 source
Kindmethodology

Study notes

  • Changeover applies both to single machines (e.g. stamping press, molding machine) and to linked machines (e.g. assembly line or cell).
  • Changeover is also referred to as a setup.
  • Changeover time starts at the last piece of the completed run and ends at the first good piece after the changeover.
  • The document cross-references Single Minute Exchange of Die (SMED); no further detail on SMED is given.
↑↓ navigate↵ openesc close